University of Wollongong, NSW
True Partners Consulting Engineers delivered mechanical air-conditioning and ventilation services across University of Wollongong Buildings 1, 19, 35 and 38. The commission covered feasibility reporting, complete mechanical design documentation, construction shop drawings, as-built records and O&M manuals across teaching, research and administrative environments.
North Parramatta, NSW
True Partners Consulting Engineers delivered the complete mechanical-services design and documentation for Tara Anglican School for Girls’ Aquatic Centre and gymnasium extension in North Parramatta. Completed in 2023, the precinct includes a heated 25-metre eight-lane competition pool, a separate learn-to-swim pool, tiered spectator seating, change facilities, administration areas and a fitness centre adjoining the existing gymnasium.
Seven Hills, NSW
True Partners Consulting Engineers delivered D&C mechanical design documentation, construction shop drawings, as-built records and an O&M manual for Seven Hills High School’s Vocational Innovation Centre. Opened for Term 1 in 2024, the facility provides specialist training spaces for health and aged care, electrotechnology, drainage, supply-chain operations, business, finance, live production and sports coaching.
Kogarah, NSW
True Partners Consulting Engineers delivered the mechanical, hydraulic and electrical services design and documentation for Marist Catholic College Kogarah’s 2016 learning-space refurbishment. The project introduced new hospitality kitchens and a construction workshop, relocated Visual Arts into four flexible studios with operable partitions and created an open-plan learning area.