SPORTS AND LEISURE CENTRE

Parramatta Aquatic & Leisure Centre

The new aquatic and leisure centre covers 40,000 square metres in Parramatta Park. The centre includes a 50-metre, 10-lane outdoor heated pool with seating; a 25-metre indoor recreational pool; an indoor learn-to-swim pool; an indoor splash play area; multipurpose community rooms; spa and sauna facilities; fitness centre; café with kitchen exhaust and treatment suitable for horizontal discharge at the roof level; and up to 200 parking spots.

Our engineering team delivered D&C mechanical design documentation, shop drawings for construction, As Built drawings and O&M manual for mechanical services.

Wollondilly Performing Arts Centre

The multi-function theatre allows configurations of theatre and concerts between 200-500 seats, conferences, and sit-down dining.

The new theatre presents a large double height, glazed façade to the main road with the opportunity for art exhibitions and the activity of the foyer spaces to be visible from the street. 

Our engineering team delivered D&C mechanical design documentation, shop drawings for construction, As Built drawings and O&M manual for mechanical services.

Wentworth Hottel, 195 Parramatta Rd, Homebush NSW

Hotel upgrade features new function rooms, sports bar, family dining, and kids play area. It also included air conditioned semi indoor gaming area with indoor smoking allowed. True Partners Consulting Engineers delivered mechanical engineering D&C documentation for the mechanical contractor.

Tara School, New Aquatic Centre and Gym Extension

Tara is a highly respected institution known for its dedication to educational excellence. Situated amongst the existing gymnasium/multipurpose hall, main oval, and tennis courts, the new Aquatic Centre includes many impressive features such as a 25-meter, eight-lane competition pool complete with accompanying amenities, tiered seating, and a fitness centre. Additionally, the facility houses a separate learn-to-swim pool that comes equipped with change rooms, shower, and toilet facilities.

Project included full design and documentation of mechanical services for the new aquatic centre, admin office and amenities area and gym extension.